Riverina Diggers0447 406 985

Riverina Diggers › Concrete Cutting Saw hire

Petrol demo saw · from $145 a day

Concrete saw hire in Griffith

A petrol demo saw for cutting slabs, driveways and paths. Cut the line first and the concrete comes out where you want it — not in a spiderweb of cracks across the bit you were keeping.

What it costs

HirePriceNotes
1 day$1458 hours, extra hours $35
Weekend$200Saturday and Sunday
1 week$520Best value on longer jobs

Delivery is free on hires of three days or more within 30km of Griffith. Shorter hires and jobs further out are quoted from a $90 base plus $2.20 per km. A $500 bond applies and comes back once the gear is checked over.

Cut first, break second

The mistake that costs people a weekend is going at a slab with a breaker and no cut line. Concrete cracks along whatever path it likes, which is usually into the section you meant to keep. A saw cut gives the break somewhere to stop.

Score the line, then break out the waste side with the excavator, and you get a straight edge you can pour back against or pave up to.

What it cuts

Blades and dust

Blades are charged at cost on top of the hire — cutting reinforced concrete wears a blade and it wouldn't be fair to build that into everyone's rate. Tell us what you're cutting when you book and the right blade goes on the machine.

Cut wet where you can. It keeps the blade alive longer and it keeps the silica dust down, which matters more than most people realise — dry-cutting concrete throws respirable crystalline silica and that's the one that does permanent damage. Eye and ear protection are the minimum; a P2 mask is sensible.

The full demolition hire

Saw, excavator and tipper in the same booking is the standard demolition package: cut the slab, break it out, load it, cart it. One hire, one trip, no skip bin sitting out the front for a fortnight.

Common questions

How much is concrete saw hire in Griffith?

$145 for a day, $200 for a weekend, $520 for a week. Blades are charged at cost on top, based on what you're cutting.

Why are blades charged separately?

Cutting reinforced concrete wears a blade down fast, and how fast depends entirely on the job. Charging blades at cost means someone cutting a couple of joints isn't subsidising someone cutting out a reinforced slab all week.

How deep will it cut?

Depth depends on the blade fitted. Tell us the slab thickness when you book and we'll set it up appropriately — for thick slabs, cutting from both sides is often the answer.

Do I need safety gear?

Eye and ear protection at a minimum. Cut wet where you can and wear a P2 mask if you can't — dry-cut concrete dust contains crystalline silica, which causes permanent lung damage.

Also in the yard

1.7t Zero Swing Excavatorfrom $195 a dayTipper Truckfrom $350 a dayRide-on Rollerfrom $220 a dayPlate Compactorfrom $125 a day

Ready to book? Check your dates on the booking calendar or ring 0447 406 985. We're in Griffith and we deliver across the MIA — see the service area.